GPS Innova Terminal

In October 2018, GPS closed a transaction with Innova Refining and Chemie Tech in Dubai concerning a JV to develop a Greenfield terminal in Hamriyah Free Zone, Sharjah, UAE. The terminal will have a capacity of 177,640 cubic meters and will primarily serve as an industrial terminal for Innova's nearby waste oil re-refinery which is in the process of being commissioned with a capacity of over 1 million metric tons per year. The terminal construction is well underway and will be commissioned early in 2020.

Technical Overview

Capacity
  • c.177,640m3
Tanks

23 no. above ground, API 650 tanks, A mix of CS / SS, dependent on service, fitted with IFR or heating coils / insulation

Products

Bitumen, Fuel oils, Gasoils, Gasoline, Petrochemicals

Vapour Recovery

Yes, Gasoline road loading

Jetties

Inner harbour, 6.5m draft and main haarbour, 14m draft

Pipelines

Multiple pipelines to both jetties. All lines fitted with cleaning scrappers

Blending

In tank jet mixers and static paddle mixers. Injection systems for blend components available

Facilities

  • Connectivity to inner harbor and main harbor
  • Truck loading / unloading
  • Multiple pumps allowing simultaneous operations
  • Segregated piping systems
  • Heating and mixing systems
GPS Innova Terminal 1
GPS Innova Terminal 2